Fields-Ertel Road Widening

Project Info:

This project is proposed to widen Fields-Ertel Road between Wilkens Boulevard and Snider Road from two to either three or five lanes. It will adjust the roadway alignment and make this entire section of road much safer. In addition, there will be curb, gutter and stormsewer improvements.

Currently, the road suffers from poor vertical alignment and sight distance issues. In addition, the roadway is carrying much more traffic than it was intended to and congestion is a problem during peak travel times.

Tentative Project Schedule:

  • 2018 – 2019: Project Design
  • 2019 – 2020: Right-of-Way Acquisition
  • 2020 – 2021: Utility Relocation
  • 2022 – 2023: Construction

PUBLIC OPEN HOUSE – DECEMBER 5, 2018
For information presented at the meeting and comment sheets, visit: http://www.wctid.us/OpenHouse.aspx